2021-08-03 at 11:08 am
#2043
In power transformers installed in power network , in any case one side is considered generation side , and the other side despite connecting with an active element is considered load . Now , if due to conditions of network the generation winding is going to be changed into consuming winding , for a very short time the magnetizing current is absorbed from both sides. Little by little , the portion of one side approaches to zero and all magnetizing current is absorbed from generation side.